building an airstrip
A general forum for anything related to flying the backcountry. Please check first if your new topic fits better into a more specific forum before posting.
Skydive206, Good to see you posting again and making progress!
-
Meat Servo offline
-
Posts:
170
- Joined: Thu Oct 23, 2008 7:27 am
- Location: A mountain valley
"Colin
We were excited to heli in Silverton — until we saw the bird. Looking like something your stoner uncle built in the garage out of four Meccano sets, a fish tank, and an AMC Pacer, this helicopter seats a pilot plus two only, making it a tricky vehicle, logistics-wise, when your group has 8 people in it. Photo: Torcom"
What slope should I use on the Concrete for my hanger floor? What is good for drainage but not to much to push the plane in?
-
Skydive206 offline

-
Posts:
551
- Joined: Wed Mar 25, 2009 7:54 pm
- Location: Williamsburg, MO
-
They call it Fall, it depends which way you want the water to go if you get water in there. I think the hangar floor should be level but the approach should be sloped down and away. Your finisher should know.
-
Glidergeek offline


-
Posts:
1937
- Joined: Sat Sep 06, 2008 8:02 pm
- Location: Hesperia
- Aircraft: 1968 P206C
DG 400
-
Skydive206 wrote:What slope should I use on the Concrete for my hanger floor? What is good for drainage but not to much to push the plane in?
Personally I would shoot for 1/8" to 1/4" per foot.. Any less will not drain and any more will make pulling the plane in noticable. IMHO.
-
Stol offline

-
Posts:
1048
- Joined: Wed Dec 07, 2005 8:32 pm
- Location: Jackson Hole Wy
-
Fri Sep 21, 2012 10:46 am
I went with 4 inch Fibermesh. Just poured the 2600sq and they are finishing it now. I hope to get the 3000sq pad done next week.
-
Skydive206 offline

-
Posts:
551
- Joined: Wed Mar 25, 2009 7:54 pm
- Location: Williamsburg, MO
-
Wed Oct 10, 2012 11:45 am
I went with a 1/16 per foot fall. It still is an effort to push the U206 with big tires by myself up and into the hanger. After the rains the water runs off ok but I did end up with a big 1 inch low spot right at my loading area. 5600 sqft 4 inch with Fibermesh cost me $10,500 installed. Me and some Skydiver Labor prepared the site. I am going to core drill for outside tie-downs and create a drain for that low spot. I extended the ramp to make a run-up and launching pad next to the hanger. I have to move a bunch of dirt to build up around the ramp. It is very nice to work on the plane on concrete again. Drop a washer and it is right there. It is not a dark in the hanger anymore, the light reflects off the concrete giving me reflective light to work on the plane.
https://picasaweb.google.com/lh/photo/hJ4FYv6eXnQbGy0usdZsmtMTjNZETYmyPJy0liipFm0?feat=directlink
-
Skydive206 offline

-
Posts:
551
- Joined: Wed Mar 25, 2009 7:54 pm
- Location: Williamsburg, MO
-
The best thing I ever did was trade crane work for a nice big ramp/ staging area outside the hangar. 2% grade for runoff. Didn't cost me a cent! My concrete buddy knows he can count on me to lift his forms out of diffucult sites, just did one 3 days ago. Great refueling site too. Nearly level paved surface is precious on this mountain side and much appreciated! Point being, a nice hangar floor is even better with a outside slab.....hell it's only money

-
courierguy offline

-
Posts:
4197
- Joined: Thu Mar 31, 2005 6:52 pm
- Location: Idaho
"Its easier to apologize then ask permission"
Tex McClatchy
Sun Nov 11, 2012 10:11 am
http://youtu.be/5jk1KdY6oms Did a maint flight with the wifes U206C. Uphill takeoff into the 8 mph wind. To bad you cant see the VSI well. 12 oclock is 1000 fpm and 3 oclock is 2000 fpm. I dont get to fly this airplane much and was surprised of the pull up the hill.
-
Skydive206 offline

-
Posts:
551
- Joined: Wed Mar 25, 2009 7:54 pm
- Location: Williamsburg, MO
-
The Flying V Ranch just got its identifier and approval for landing facility. 10MO . That took a while and a lot of calls. Dont know if or when it will be on the map. Next will try and get the parachute symbol.
-
Skydive206 offline

-
Posts:
551
- Joined: Wed Mar 25, 2009 7:54 pm
- Location: Williamsburg, MO
-
Power lines at end of runway. After a few unreturned calls from the power company I got pissed and wouldn't let up until I got a reply. The cost here in Mo wasnt to bad to have the wire put underground. $14 per foot I think but each time I asked it was a different number. I said "do you just keep saying a bigger number and hope I will go away?" I determined I could cover the price but it was going to require an easement from the land owner that doesn't like airplanes. I will try and see what I can do about that. I had to settle for the balls. Went with 2 12in balls that cost me about $100 each. The power company started to get easier to deal with when I got a direct line number and showed how serious I was. They put the balls up at no cost to me.
-
Skydive206 offline

-
Posts:
551
- Joined: Wed Mar 25, 2009 7:54 pm
- Location: Williamsburg, MO
-